Objective: Replacement of the trailing cables between the central control box, the individual crane drives and the various components while avoiding extensive installation and wear.
Example (see illustration on the right): 1 Crane travel 2 Trolleys/lift 3 Crane components, e.g. lifting hardware.
The solution: By mounting receivers to each crane and integrating them into the electronic circuits of the crane drives and components it is possible to replace trailing cables. Each receiver solely responds to the statements designated for the respective crane drive and components.
MRC:
Benefits:
|